Skip to content
Robot Risk DeskFind an assessorAsk about cover

Home/Safety/Risk assessment

A robot risk assessment starts with tasks and hazards

Every task near the robot, crossed with every way it can hurt someone. Build your list here, then hand it to your assessor.

Tap each place where a task meets a hazard in your cell.

0 pairs to assess
TaskStruck by or caught betweenStruckCrushing and trappingCrushThrown parts or toolsThrownElectricalElec.Hydraulic or pneumatic energyFluidSlips, trips and fallsSlip
Normal running
Loading parts
Teaching and programming
Clearing a jam
Maintenance
Cleaning
Troubleshooting
Bring the list to your assessor. They rate each pair and pick the safeguard.

It is due before start-up, and again at every stage

OSHA's technical manual puts it on the integrator to make sure a risk assessment is done and documented before the cell is commissioned.1

The same chapter asks for it at each stage, from design to maintenance.

  1. Design
  2. Build
  3. IntegrateDocumented before start-up
  4. Operate
  5. Maintain

The risky moments are the ones outside normal running

OSHA notes that many robot accidents happen during programming, maintenance, testing, setup and adjustment.2 Those tasks put a person inside the cell, often with power on.

  • Teaching: the person is close to the arm with a pendant in hand.
  • Clearing jams: fast, unplanned, and tempting to do without a lockout.
  • Maintenance: covered by OSHA's lockout rule.3

A task-based assessment records six things per line

OSHA lists RIA TR R15.306, the task-based method, among the industry documents for robots.4 Your assessor's template decides the exact columns.

TaskHazardRisk beforeSafeguardRisk afterChecked by
Loading partsStruck by the armHighLight curtain at the load openingLowIntegrator, signed
Clearing a jamUnexpected start-upHighLockout at the disconnectLowMaintenance lead
TeachingCaught between arm and fixtureMediumReduced speed and enabling deviceLowIntegrator, signed

Example lines to show the layout. Ratings in your cell come from your assessor.

Assess again whenever the cell changes

A change can add a hazard the first assessment never saw. OSHA's lockout rule also requires retraining when equipment or processes change.3

01New part or fixture
02New tool on the arm
03Higher speed or payload
04Moved fence or opening
05New program or safety setting
06New people or shifts

Questions buyers ask

OSHA's technical manual makes the integrator responsible for getting it done and documented before start-up. Some plants also bring in an independent assessor for a second view.

Ready to have your list checked?

Send us your cell and your list. We read every request and come back to you.